Commercial Laundry.
Two VWT50 boilers in a lead-lag system
- Location
- NSW
- Boiler system
- ECS Vertical Watertube
- Output
- 2 x VWT50

Our most recent project for one of our long-term clients in regional NSW. They trusted us to replace their old, retired D-type watertube boiler with a modern, efficient vertical boiler steam system.
We began with a full feasibility study, including detailed load calculations, to establish the steam load their operation needs. After careful consideration we chose a turnkey solution using two 50VWT vertical watertube boilers in a lead-lag configuration. The package included modulating Riello burners, TDS blowdown, dual feedwater pumps, feedtank level monitoring and a clock start function.
The system was designed with four goals in mind:
- Better efficiency. Two smaller boilers instead of one large unit optimise fuel use and reduce wasted energy.
- Better reliability. In a lead-lag system, if one boiler needs maintenance or has a fault, the other keeps running, so downtime is minimal.
- Scalability. The configuration manages the load better and scales up or down with demand.
- Cost savings. Higher efficiency and less downtime mean lower operating costs over time.
At TBS we are committed to solutions tailored to each client’s needs, and this project shows our focus on innovation and quality in steam system design and installation.